Executive Assistant

  Ministry Of Agriculture Irrigation and Livestock
Bachelor's Degree   Afghanistan, Kabul Full Time 2439
Date Posted:Apr 18, 2017
Reference:MAIL/OFWMP/98
Closing Date:May 4, 2017
Work Type:Full Time
Number of Vacancies:1
Gender:Female
Functional Area:Administrative
Nationality:Afghan
Salary Range:As per NTA salary scale policy
Years of Experience:2 Years
Contract Duration:Not specified
Extension Possibility:No
Contract Type:Service Contract
Probation Period:3 months
Required Languages:96,90,66

About Ministry Of Agriculture Irrigation and Livestock:

Founded:  

The Ministry of Agriculture, Irrigation and Livestock is implementing “On Farm Water Management (OFWM)” Project, financed by the Afghanistan Reconstruction Trust Fund (ARTF), in five (5) regions, namely: Kabul, Nangarhar (Jalalabad), Balkh (Mazar-i-Sharif), Baghlan and Heart. The overall development objective (PDO) of the OFWM-Project is to improve agricultural productivity in the Project Areas by enhancing the efficiency of water used. A Kabul-based Project Management Unit (PMU) headed by the Project Manager, with the assistance of Core Team of Specialists, is responsible for execution of the project. Five Area Teams: one each in Kabul, Nangarhar (Jalalabad), Mazar-i-Sharif (Balkh), Bamyan and Heart, have been established for implementation of field activities. The project started its implementation from March, 2011 for a period of 3 years and is being monitored by Worlds Bank. The project closing date has recently been extended up to April 2016. The project has received additional fund from the World Bank (the Bank) and the period of the OFWMP has been extended to December 2019.

Job Summary:

Part A: On-Farm Water Management
1. Carrying out social mobilization for the establishment of Irrigation Associations (IAs) in the Project Areas, including, inter alia, the provision of: (a) training to communities in organization and management of IAs; (b) facilitation services for communities to develop the IAs’ internal legal rules and regulations (by-laws); (c) assistance to IAs in order for them to be registered under the Water Law (1388); and (d) technical training to IAs regarding water distribution, maintenance of irrigation infrastructure, irrigation methods, water-saving techniques, crop-water requirements, and good agronomic practices.
2. (a) Carrying out rehabilitation works to small irrigation schemes or tertiary canals (watercourses) covering approximately 40,000 hectares in total in the Project Areas, including, inter alia: (a) rehabilitation of existing intakes, (b) canal lining; (c) construction of control structures and outlets; (d) construction of, culverts, laundry basins and cattle troughs; and
(b) Improving design standards and strengthening the private sector’s capacity for contract management and construction techniques.
3. Establishing easily accessible pilot irrigation demonstration sites in the Project Areas to showcase improved water management practices/technology and agronomic water saving techniques/measures, as well as proper farm planning and layout for an efficient use of irrigation water.
Part B: Institutional Strengthening and Capacity Building of MAIL
Developing the institutional capacity of MAIL to plan, design, implement and monitor irrigation programs, including, inter alia: (a) construction and/or renovation of office buildings, one each in Kabul, Jalalabad, Baghlan, Mazar-e-Sharif and Herat, respectively for MAIL and Project staff; (b) strengthening of MAIL’s Directorate of Irrigation at national, provincial and district levels; (c) strengthening the legal framework for the irrigation sector, (d) developing a national irrigation program, (e) undertaking of technical training in the irrigation sector including study tours transferring on-farm water management know-how; and (f) developing a database covering irrigation systems throughout the country.
Part C: Project Management, Coordination, Monitoring & Evaluation
Strengthening the institutional capacity of MAIL for Project implementation, policy development, and technical innovation, monitoring and evaluation, by establishing and maintaining a Project Implementation Unit comprised of a Kabul-based core team, five (5) Project Area Teams and internationally recruited experts.
Part D: Support for Productivity Enhancement
1. Establishing easily accessible pilot irrigation demonstration sites in the Project Area to showcase improved water management practices/technology and agronomic water saving techniques/measures, improved agronomic and social management practices, as well as proper farm planning and layout for an efficient use of irrigation water.
2. Promoting land leveling and high-efficiency irrigation technologies in the Project Area.
3. Establishing Information Centers for farmers at the provincial and district level in the Project Area.

Duties & Responsibilities:


Prepare and manage correspondence, reports and documents.

Ability to compose letters, memoranda, minutes of meeting through c utilizing appropriate formats and styles.

Organize and coordinate meetings, and conferences.

Take, type and distribute meeting minutes.

Arrange and confirm appointments

Organize internal and external project related events

Handle incoming calls and mails

Set up and maintain efficient filing systems

Collect relevant information about the project

Communicate verbally and in writing to answer inquiries and provide information.

Liaise with internal and external contacts, donors and various departments of the ministry

Coordinate the flow of information both internally and externally

Job Requirement:

 Bachelor degree in literature, BBA, or relevant field with minimum of 2 years job relevant experience
 Must be very fluent in Pashto, Dari, and English languages both in speaking and writing/understating
 Must have Good communication and interpersonal skills.
 Relevant training or qualification is an advantage
 Knowledge and experience of Ms Windows and Ms Office, and good typing speed of Dari/ Pashto
 Knowledge of administrative and clerical procedures
 Proven experience of producing correspondence and documents
 Proven experience in information and communication management

Job Location:

Afghanistan, Kabul
This job is expired